Weekly analysis on DWDM, IP transit, submarine cables, peering, and telecom regulation — written for carrier, ISP and enterprise network decision-makers. Curated by the Sofia Connect team.
A wavelength is capacity someone else lights. Dark fibre is glass you light yourself. A practical comparison of the two on cost, control, distance and time to service, with worked numbers for the Sofia metro and the Sofia–Frankfurt corridor.
A 1G transit port costs more per megabit than a 100G port, a longer term lowers the price, and redundancy raises it. A plain guide to what moves an IP transit quote, with our indicative list prices and where they sit against the European market.
An availability percentage is a monthly downtime budget. The difference between 99.9% and 99.99% is 43 minutes against 4. A plain guide to what each redundancy tier means, why repair times matter as much as the percentage, and when protection is worth paying for.
Vodafone and NEQSOL's Kardesa cable is due to land at Aheloy in 2027, with two new fibre routes to Sofia. In the same month Brussels announced up to EUR 623 million for digital links to Central Asia, but none of it goes to Black Sea cables. What is decided, what is not, and what carriers should ask.
Iraq now has a state transit backbone from Faw to the Turkish border, its first IRU sales and a queue of Gulf cables wanting to land at Faw. The new WorldLink system from Abu Dhabi is the boldest of them. A short map of what is built, what is signed and what is still a press release.
Ten months after the Commission's proposal, the Council is still in its first reading and the Parliament's lead rapporteur has just put binding interconnection disputes back on the table. A short state of play, and five things operators can prepare now.
EXA has completed new terrestrial routes from Paris to Vienna and Milan to Zurich. Their value for the Balkans will depend on how much physical route diversity buyers can verify.
BT’s TalkTalk rescue kept 2.5 million customers connected, but the UK’s public-interest review asks regulators to weigh continuity against competition.
Aqaba Digital Hub will reach the Medusa network through the Coral Bridge. The commercial value depends on the unannounced route, handoffs and service terms.
Meta's Petal targets 1 Pbps between the US and France in 2029. The important shift is not the headline number, but multi-core fibre moving into a commercial cable.
Firebird opens in Armenia. HUMAIN switches on in Saudi Arabia. Nebius doubles down in Israel. The AI campuses are landing between Yerevan and Riyadh, and the question is who carries their traffic to Frankfurt.
The 50% fine discount expired on 1 June 2026. Three months later, the first-wave EU fines are visible, Bulgaria's competent authorities were only being designated in August, and telecom operators are being asked for evidence, not architecture.
4iG and SpaceX plan direct-to-device services in Hungary and the Western Balkans. The commercial question is whether spectrum, resilience and wholesale integration can follow.
Telecom Egypt's 200-kilometre Sharm El Sheikh–Taba cable will add a 5-Pbps design path to a landing point already tied to Aqaba. The commercial model now matters.
The first fiber across the Caspian is now on the seabed. Its value for Europe and the Balkans will depend on terrestrial diversity, capacity disclosure, and a credible RFS.
The Georgia–Romania Black Sea interconnector has entered marine-survey preparation. Its fiber leg could reshape route diversity, but the telecom product is still undefined.
The ITU-ICPC Advisory Body closed two years of work with data: repair response time more than doubled since 2012, and 80%+ of faults are still human-caused.
In four days, the FCC extended US cable licensing to onshore SLTE and the European Commission funded two Regional Hubs and a €40M repair call. One threat, two logics.
LightCounting now expects 800G optical transceiver shipments to more than double in 2026, with 1.6T sales surpassing $2 billion for the first time. For regional carriers, this is the year when the cost-per-bit math for second-generation coherent flips.
Sparkle's MoU with NaiTel and iLevant to extend the GreenMed system into Jordan ties an EU-funded subsea corridor directly into the India–Middle East–Europe Economic Corridor. For SEE carriers, this changes how Europe–Asia traffic will be priced and routed by the late 2020s.
·4 min read
Sofia Connect Insights
Weekly analysis on regional telecom infrastructure
DWDM, submarine cables, IP transit, peering, regulation, M&A — one email per week, written for engineers and decision-makers. No marketing.
By subscribing you agree to receive emails from Sofia Connect EAD. You can unsubscribe at any time. Privacy.