Dark Fiber
Unlit G.652D single-mode fibre in the Sofia metro today — reaching all data centres and business buildings across the city. Sofia–Kalotina is on our roadmap, in service mid-2027. Onward reach to Frankfurt, Amsterdam and Marseille is partner-delivered from Kalotina once the corridor is live.
Technical Specifications
G.652D
Fiber Type
1–96
Fiber Pairs
Limited only by the optics you attach
Capacity
IRU / Long-term
Lease Terms
Available
Route Diversity
Documented
Splice Points
Included
OTDR Testing
15–30 days — Sofia metro
Provisioning
Roadmap enquiry
Planned corridors
Key Features
Full Infrastructure Control
You own the light. Deploy your own DWDM, CWDM, or direct-attach optics. Upgrade capacity at any time without service provider involvement.
IRU & Long-Term Leases
Indefeasible Right of Use (IRU) agreements for 15 years, or flexible shorter-term leases. Predictable CAPEX for network planning.
Route Diversity
Diverse routing available inside the Sofia metro today. Diversity on the planned cross-border corridors is discussed on request.
Comprehensive Documentation
Full route maps, splice point documentation, fiber characterization reports, and OTDR test results provided at handover.
Termination Where You Need It
We terminate the fibre in the data centre or building you choose in Sofia. Rack space and power are arranged directly with the data centre operator; Sofia Connect does not provide colocation.
Maintenance & Monitoring
Repair is included in the SLA, with a target of 8 hours from the confirmed ticket. 24/7 NOC monitoring of the fibre.
Use Cases
Carrier Network Build
Foundation for carriers and ISPs building their own transport networks. Full control over capacity planning and technology evolution.
Campus & Metro Connectivity
High-capacity fiber links between campuses, office buildings, and data centers within metropolitan areas. Future-proof infrastructure investment.
5G & Edge Backhaul
High-density fiber for mobile operators deploying 5G base stations and edge computing nodes. Scalable fronthaul and backhaul infrastructure.
Available in these cities
Dark Fiber in service today in the Sofia metro. Sofia–Kalotina is on the roadmap (in service mid-2027) — route-level enquiry only.
Ready to Get Started?
Our network engineers will design the optimal solution for your requirements. Typical provisioning takes 15–30 business days.